GSO IWA 33-2:2025

IWA 33-2:2019
Gulf Standard   Current Edition · Approved on 14 October 2025

Technical guidelines for the development of small hydropower plants — Part 2: Site selection planning

GSO IWA 33-2:2025 Files

English 30 Pages
Current Edition Reference Language
OMR 75.7

GSO IWA 33-2:2025 Scope

This document specifies the general principles of site selection planning for small hydropower (SHP) projects, and the methodologies, procedures and outcome requirements of SHP plant site selection.

Best Sellers From Electrical Sector

GSO 2530:2016
 
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
OS GSO 2530:2016
GSO 2530:2016 
Omani Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
OS GSO 34:2007
GSO 34:2007 
Omani Standard
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES
GSO 34:2007
 
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES

Recently Published from Electrical Sector

OS ISO 22366:2026
ISO 22366:2026 
Omani Standard
Security and resilience — Community resilience — Framework and principles for energy resilience
OS IEC 62196-7:2026
IEC 62196-7:2026 
Omani Standard
Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 7: Vehicle adapters
OS IEC 63409-3:2026
IEC 63409-3:2025 
Omani Standard
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 3: Basic operations
OS IEC 63379:2026
IEC 63379:2026 
Omani Standard
Vehicle connector, vehicle inlet and cable assembly for megawatt DC charging