GSO BS 812-110:2025
BS 812-110:1990
Gulf Standard
Current Edition
·
Approved on
14 October 2025
Testing aggregates – Part 110: Methods for determination of aggregate crushing value (ACV)
GSO BS 812-110:2025 Files
No files for this standard are available in the store currently.
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
GSO BS 812-110:2025 Scope
This Part of BS 812 describes a method for the determination of the aggregate crushing value (ACV) which gives a relative measure of the resistance of an aggregate to crushing under a gradually applied compressive load. The method is applicable to aggregates passing a 14.0 mm test sieve and retained on a 10.0 mm test sieve. For other size fractions, a recommended method is described in appendix A. The method is not suitable for testing aggregates with an aggregate crushing value higher than 30, and in such cases the method for ten per cent fines value described in BS 812-111 is applicable.
NOTE The titles of the publications referred to in this standard are listed on the inside back cover.
Best Sellers From Construction and Building Sector
GSO 1431:2002
Gulf Technical Regulation
Sanitary appliances - pressurized flushing devices
OS GSO 1431:2002
GSO 1431:2002
Omani Standard
Sanitary appliances - pressurized flushing devices
GSO 1427:2008
Gulf Standard
Ceramic Sanitary Appliances - Western Water Closets
OS GSO 1427:2008
GSO 1427:2008
Omani Standard
Ceramic Sanitary Appliances - Western Water Closets
Recently Published from Construction and Building Sector
GSO ASTM C687:2025
ASTM C687:24
Gulf Standard
Standard Practice for Determination of Thermal Resistance of Loose-Fill Building Insulation
GSO ASTM C494/C494M:2025
ASTM C494/C494M:24
Gulf Standard
Standard Specification for Chemical Admixtures for Concrete
GSO ASTM C1767:2025
ASTM C1767:21
Gulf Standard
Standard Specification for Stainless Steel Jacketing for Insulation
GSO ISO 22185-2:2025
ISO 22185-2:2024
Gulf Standard
Diagnosing moisture damage in buildings and implementing countermeasures — Part 2: Assessment of conditions