GSO IEC/IEEE 61850-9-3:2025

IEC/IEEE 61850-9-3:2016
Gulf Standard   Current Edition · Approved on 22 April 2025

Communication networks and systems for power utility automation - Part 9-3: Precision time protocol profile for power utility automation

GSO IEC/IEEE 61850-9-3:2025 Files

GSO IEC/IEEE 61850-9-3:2025 Scope

IEC/IEEE 61850-9-3:2016(E) specifies a precision time protocol (PTP) profile of IEC 61588:2009 / IEEE Std 1588-2008 applicable to power utility automation, which allows compliance with the highest synchronization classes of IEC 61850-5 and IEC 61869-9.

Best Sellers From Electrical Sector

GSO 2530:2016
 
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
OS GSO 2530:2016
GSO 2530:2016 
Omani Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
OS GSO 34:2007
GSO 34:2007 
Omani Standard
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES
GSO 34:2007
 
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES

Recently Published from Electrical Sector

GSO IEC 63203-402-3:2025
IEC 63203-402-3:2024 
Gulf Standard
Wearable electronic devices and technologies - Part 402-3: Performance measurement of fitness wearables - Test methods for the determination of the accuracy of heart rate
GSO IEC 61010-2-033:2025
IEC 61010-2-033:2023 
Gulf Standard
Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-033: Particular requirements for hand-held multimeters and other meters for domestic and professional use, capable of measuring mains voltage
GSO IEC 60287-1-3:2025
IEC 60287-1-3:2023 
Gulf Standard
Electric cables - Calculation of the current rating - Part 1-3: Current rating equations (100 % load factor) and calculation of losses - Current sharing between parallel single-core cables and calculation of circulating current losses
GSO IEC TS 63042-302:2025
IEC TS 63042-302:2021 
Gulf Standard
UHV AC transmission systems - Part 302: Commissioning