GSO IEC 61400-26-1:2024
IEC 61400-26-1:2019
Gulf Standard
Current Edition
·
Approved on
14 October 2024
Wind energy generation systems - Part 26-1: Availability for wind energy generation systems
GSO IEC 61400-26-1:2024 Files
English
213 Pages
Current Edition
Reference Language
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
GSO IEC 61400-26-1:2024 Scope
IEC 61400-26-1:2019 defines an information model from which time-based, and production-based availability indicators for services can be derived and reported.
The purpose is to provide standardised metrics that can be used to create and organise methods for availability calculation and reporting according to the user’s needs.
The document provides information categories, which unambiguously describe how data is used to characterise and categorise the operation. The information model specifies category priority for discrimination between possible concurrent categories. Further, the model defines entry and exit criteria to allocate fractions of time and production values to the proper information category. A full overview of all information categories, exit and entry criteria is given in Annex.
The document can be applied to any number of WTGSs, whether represented by an individual turbine, a fleet of wind turbines, a wind power station or a portfolio of wind power stations. A wind power station is typically made up of all WTGSs, functional services and balance of plant elements as seen from the point of common coupling.
This first edition cancels and replaces IEC TS 61400-26-1:2011, IEC TS 61400-26-2:2014 and IEC TS 61400-26-3:2016.
The purpose is to provide standardised metrics that can be used to create and organise methods for availability calculation and reporting according to the user’s needs.
The document provides information categories, which unambiguously describe how data is used to characterise and categorise the operation. The information model specifies category priority for discrimination between possible concurrent categories. Further, the model defines entry and exit criteria to allocate fractions of time and production values to the proper information category. A full overview of all information categories, exit and entry criteria is given in Annex.
The document can be applied to any number of WTGSs, whether represented by an individual turbine, a fleet of wind turbines, a wind power station or a portfolio of wind power stations. A wind power station is typically made up of all WTGSs, functional services and balance of plant elements as seen from the point of common coupling.
This first edition cancels and replaces IEC TS 61400-26-1:2011, IEC TS 61400-26-2:2014 and IEC TS 61400-26-3:2016.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners

OS GSO 2530:2016
GSO 2530:2016
Omani Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners


OS GSO 34:2007
GSO 34:2007
Omani Standard
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES


GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES

Recently Published from Electrical Sector
GSO 2770:2024
Gulf Standard
WATER HEATERS - ENERGY PERFORMANCE REQUIREMENTS

GSO IEC TS 62257-4:2024
IEC TS 62257-4:2015
Gulf Standard
Recommendations for renewable energy and hybrid systems for rural electrification - Part 4: System selection and design


GSO IEC 61968-13:2024
IEC 61968-13:2021
Gulf Standard
Application integration at electric utilities - System interfaces for distribution management - Part 13: Common distribution power system model profiles


GSO IEC 62246-4:2024
IEC 62246-4:2023
Gulf Standard
Reed switches – Part 4: Application in conjunction with magnetic actuator used for magnetic sensing devices

