OS GSO IEC 60071-2:2024
IEC 60071-2:2023
Omani Standard
Current Edition
·
Approved on
14 October 2024
Insulation co-ordination - Part 2: Application guidelines
OS GSO IEC 60071-2:2024 Files
No files for this standard are available in the store currently.
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
OS GSO IEC 60071-2:2024 Scope
IEC 60071-2:2023 is available as IEC 60071-2:2023 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 60071-2:2023 constitutes application guidelines and deals with the selection of insulation levels of equipment or installations for three-phase AC systems. Its aim is to give guidance for the determination of the rated withstand voltages for ranges I and II of IEC 60071‑1 and to justify the association of these rated values with the standardized highest voltages for equipment. This association is for insulation co-ordination purposes only. The requirements for human safety are not covered by this document. This document covers three-phase AC systems with nominal voltages above 1 kV, phase-to-earth, phase-to-phase and longitudinal insulation. It has the status of a horizontal standard in accordance with IEC Guide 108. This edition includes the following significant technical changes with respect to the previous edition:
a) Clause 4 Concepts governing the insulation co-ordination has been added.
b) Subclause 5.3 has been revised, and Subclause 5.4 Detailed simulation has been added because it is widely applied in the recent practices of insulation coordination.
c) Special considerations for cable line and GIL/GIB have been added in Clause 9.
d) Annex K (informative) Application of line shunt reactor to limitation of TOV and SFO in high voltage overhead transmission lines has been added.
e) Annex L (informative) Calculation of lightning stroke rate and lightning outage rate has been added.
a) Clause 4 Concepts governing the insulation co-ordination has been added.
b) Subclause 5.3 has been revised, and Subclause 5.4 Detailed simulation has been added because it is widely applied in the recent practices of insulation coordination.
c) Special considerations for cable line and GIL/GIB have been added in Clause 9.
d) Annex K (informative) Application of line shunt reactor to limitation of TOV and SFO in high voltage overhead transmission lines has been added.
e) Annex L (informative) Calculation of lightning stroke rate and lightning outage rate has been added.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
OS GSO 2530:2016
GSO 2530:2016
Omani Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
OS GSO 34:2007
GSO 34:2007
Omani Standard
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
Recently Published from Electrical Sector
OS ISO 22366:2026
ISO 22366:2026
Omani Standard
Security and resilience — Community resilience — Framework and principles for energy resilience
OS IEC 62196-7:2026
IEC 62196-7:2026
Omani Standard
Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 7: Vehicle adapters
OS IEC 63409-3:2026
IEC 63409-3:2025
Omani Standard
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 3: Basic operations
OS IEC 63379:2026
IEC 63379:2026
Omani Standard
Vehicle connector, vehicle inlet and cable assembly for megawatt DC charging