OS GSO IEC 60805:2014
IEC 60805:1985
Omani Standard
Current Edition
·
Approved on
25 December 2014
Guide for commissioning, operation and maintenance of storage pumps and of pump-turbines operating as pumps
OS GSO IEC 60805:2014 Files
English
47 Pages
Current Edition
Reference Language
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
OS GSO IEC 60805:2014 Scope
The purpose of this guide is to establish, in a general way, suitable procedures for commissioning a) non-reversible hydraulic machines without movable wicket-gates, i.e. storage pumps; b) reversible hydraulic machines with fixed blade impellers and without movable wicket-gates, operating as pumps;
c) reversible hydraulic machines with fixed blade impellers and with movable wicket-gates, operating as pumps;
d) reversible hydraulic machines with adjustable impeller blades and movable wicket-gates, operating as pumps.
and associated equipment.
This guide also indicates how such machines and equipment should be operated and maintained. This guide applies to storage pumps and reversible pump-turbines of all types, especially to large units coupled to electrical motor-generators.
The guide excludes matters of purely commercial interest, except those inextricably bound up with the conduct of commissioning, operation and maintenance. It is understood that a document of this type will be binding only if, and to the extent that, both contract parties have agreed upon it.
Wherever the guide specifies that documents, drawings or information are to be supplied by a manufacturer (or by manufacturers), each individual manufacturer shall be required to furnish the appropriate information for his own supply only. The guide is not concerned with water conduits, gates, valves, drainage pumps, cooling water equipment, generators, etc., except where they cannot be separated from the machine and its equipment.
It is assumed that the turbine of the set or the pump-turbine operating as turbine has been commissioned beforehand in accordance with IEC Publication 545: Guide for Commissioning, Operation and Maintenance of Hydraulic Turbines, where applicable. Where this is not possible, an individual commissioning procedure shall be established at an early stage of plan design.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
OS GSO 2530:2016
GSO 2530:2016
Omani Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
OS GSO 34:2007
GSO 34:2007
Omani Standard
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
Recently Published from Electrical Sector
GSO IEC 63522-32:2026
IEC 63522-32:2025
Gulf Standard
Electrical relays - Tests and measurements - Part 32: Acoustic noise
GSO IEC TS 62600-301:2026
IEC TS 62600-301:2019
Gulf Standard
Marine energy - Wave, tidal and other water current converters - Part 301: River energy resource assessment
GSO IEC TS 62600-10:2026
IEC TS 62600-10:2021
Gulf Standard
Marine energy - Wave, tidal and other water current converters - Part 10: Assessment of mooring system for marine energy converters (MECs)
GSO IEC 62933-4-2:2026
IEC 62933-4-2:2025
Gulf Standard
Electric energy storage (EES) systems – Part 4-2: Guidance on environmental issues – Assessment of the environmental impact of battery failure in an electrochemical based storage system